---
title: "MVP Development | Artus Engineering"
description: "From pilot to product — MVPs for corporate innovation and midsize companies. A stack that scales, no Bubble rewrite. €50k–150k, senior team."
canonical_url: "https://artus-engineering.de/en/services/mvp-development"
md_url: "https://artus-engineering.de/en/services/mvp-development.md"
last_updated: "2026-09-11T14:47:09.931Z"
lang: en
---

# From Pilot to Product — On a Stack That Grows with You

*MVP Development*

For innovation teams and midsize leadership: we build MVPs that are genuinely minimal — on Next.js and Postgres, not on no-code you have to throw away in 12 months.

MVP phase €50k–150k · the stack scales to a full product

## The MVP Dilemma In Midsize Companies

Innovation leads and executives come to us when the steering committee expects a working product but all that exists is a pitch deck.

### The MVP Turns Into a Full Application

The feature list from the pitch deck moves one-to-one into the roadmap. In the end it costs three to five times as much and nobody uses it.

### The No-Code Trap and Rewrite Shock

Bubble or FlutterFlow to get started — migrating past roughly 10,000 users is often more expensive than going custom from the beginning. The costliest Bubble price is the rewrite.

### MVP Finished — And Then Silence

Discovery → sprint → go-live → nobody takes care of hosting, updates, or follow-up features. The MVP dilemma: built, but not operated.

### An Agency Without a Validation Focus

A first version with every feature instead of the smallest solution that teaches you something. In the end nobody uses it, because nobody asked whether it was needed.

## Why Artus Engineering

### Senior Sparring Before Code

“Should this be built at all?” — we tell you honestly before you invest €80k.

### The Same Stack from MVP to Scale

Next.js, React, TypeScript, Node, Postgres — scales to a full application. No rewrite trauma like with Bubble.

### Build and Run from One Source

Application, automation, AI, hosting — one provider for the whole journey. No “MVP done, goodbye.”

## What an Artus MVP Looks Like

### Day 1 to Day 60: Discovery → Launch

Scope cut in week one, sprints 1–3 with demos every two weeks, launch with monitoring — not “we will be in touch in six months.”

### What Goes in — And What Stays Out

A framework instead of a feature wish list: we cut honestly before any code is written. A pivot after four weeks is part of the plan.

### A Phase-Two Roadmap from Launch

What comes after the MVP — scaling on the same stack. No “new project” starting at phase two.

**No rewrite**

## MVP Stack vs. No-Code Stack

Rewrite risk, visualized.

|  | Bubble / no-code | Next.js + Postgres |
| --- | --- | --- |
| Time to MVP | 4–8 weeks | 8–12 weeks |
| Validation with real users | Yes — but limited | Yes — production ready |
| Scaling without a rewrite | No — rewrite from ~10k users | Yes — same stack |
| Code ownership | Restricted | Complete from day one |
| Follow-up features on the same stack | No — platform limits | Yes — a natural extension |
| TCO over three years | Low at first, high at scale | Predictable, scales linearly |

## A Typical MVP Timeline (60 Days)

### Weeks 1–2: Discovery and Scope Cut

What is truly minimum viable? What can wait? Honest prioritization.

### Weeks 3–6: Sprints 1–2 with Demos

Demos every two weeks — you see progress, not just status reports.

### Weeks 7–8: Sprint 3 and Hardening

Tests, monitoring, GDPR check — production ready, not demo quality.

### Week 9+: Launch and Phase-Two Plan

Go-live with operations. A roadmap for follow-up features on the same stack.

## What You Hold After the MVP

- Git repository with full access from day one
- Architecture and operations documentation (Markdown)
- Deployment scripts and runbook
- Data processing agreement and record of processing activities
- Role and permission model
- Phase-two roadmap with effort estimates
- Monitoring and alerting from launch

## A Serious MVP Corridor

### Focused MVP: €50k–80k

A clearly cut scope and one core use case

### MVP with integrations: €80k–120k

ERP/CRM integration, auth, first automations

### Complex pilot: €120k–150k

Several modules, AI features, enterprise requirements

Below €25k is no-code territory. Above €200k it is no longer an MVP phase. We talk about that openly.

## Frequently Asked Questions

### Who is this MVP service for?

Corporate innovation teams, midsize executives, and innovation leads with a €50k–150k budget. Not for solo founders with €5k — there are no-code studios for that.

### Why not Bubble or FlutterFlow?

For fast validation they sometimes make sense. As soon as scaling, custom logic, or long-term operations are on the plan, custom is cheaper — because there is no rewrite ahead.

### What if we pivot after four weeks?

That is planned for. Agile sprints with a scope cut per iteration — not a fixed price that collapses when you pivot.

### Who operates the MVP after launch?

We do — hosting, monitoring, updates. Or we hand over with a runbook. Build and run from one source, no “MVP done, goodbye.”

## Related Services

- [Web Applications](https://artus-engineering.de/en/services/web-applications.md)
- [App Development](https://artus-engineering.de/en/services/app-development.md)
- [Custom Software](https://artus-engineering.de/en/services/custom-software.md)

## Next Step

[Start a project](https://artus-engineering.de/en/contact.md)

## Sitemap

Complete overview of every page: [Sitemap](https://artus-engineering.de/en/sitemap.md)
